What began as a practical need soon sparked a creative solution. School staff explored how to maximize the building’s existing footprint, leading to a thoughtful renovation and redesign of current shop areas. A traditional classroom has now been transformed into a dedicated tech space, and the original shop has been carefully partitioned to create three distinct, fully functional shop environments.
Construction is well underway and is expected to be completed by Semester 2, with the new spaces opening for student learning at that time.
This innovative layout supports a wide range of programming, from construction and woodworking, to metal-based technology, to specialized tech opportunities for Grade 7 and 8 students. The new configuration ensures that all students can access relevant, engaging, and industry-aligned learning.